Products
Products
ObraLink Control
ObraLink Resistances
ObraLink Finishes
ObraLink Supplier
ObraLink Lite
Blog
Blog
Clients
Clients
Case Study
Company
Company
ObraLink Lab
Contact
EN
ES
Sign in
Request a demo
Back
Echeverría Izquierdo
Santiago, Chile
Parque Arauco Project
The construction company Echeverría Izquierdo uses ObraLink Control and ObraLink Concrete Strenght in the construction of the Parque Arauco shopping center, reducing the workload for their teams.